Project Description

2016.11.24-2  2016.12.23-2

 

2017.07.13-5  2017.07.15-2

 

2017.08.08-11 2017.08.08-18

This storehouse has a steel frame structure on 16 meter span with

horizontal and vertical bracings for seismic loads.