Project Description

2017.04.27-1  2017.07.21-4

 

2017.07.29-1 2017.07.29-2

 

2017.09.12 - 2  2017.09.12 - 4

The two-story office part of this building is with reinforced concrete structure.

The warehouse has a steel frame structure on 16 meters span, horizontal and vertical bracings for seismic loads.